New flat roofs

New Flat Roofs for Extensions, Dormers & Outbuildings

Building one is a different job from replacing one. There is nothing to strip, nothing hidden and no verdict to wait for: the roof is drawn before it is built, so the decisions that matter get made on paper, with whoever is putting up the structure, well before anyone reaches for a torch.

Talk about a new roof

Or call us on 07593 196505

The short answer: A new flat roof is designed before it is built: the fall, the deck, the insulation position, upstand heights at every abutment and the outlet positions. Agreeing those on drawings prevents the compromises that follow a roof worked out on site.

New build

Building a flat roof from nothing

The advantage of a new roof is that everything can be right by design instead of corrected later. Falls are the clearest example: the slope is drawn in before a sheet goes down, by firrings on the joists or tapered insulation above the deck, and the outlet sits where the fall sends the water rather than where a previous century put a hopper. Getting that right costs nothing now and is a puddle for the life of the building if it is missed.

The build-up, in order

A warm roof is the modern default, and the name describes where the insulation goes: above the structure, so the timber underneath stays at room temperature. Upward from the room that means the deck, then a vapour control layer sealed over it so moist indoor air never reaches the cold side, then insulation boards, then the waterproofing across the whole lot. Cold build-ups, with the insulation down between the joists, still have their uses when the design cannot spare the extra height, and our guide to warm roofs and cold roofs explains what each one asks of the design. On a new build there is nothing there to dispute; bringing an existing cold roof up to the same standard is a conversion, and a different job with different constraints.

What goes on top

Most new roofs we build are finished in torch-on felt: tough, repairable, and forgiving of the foot traffic a building site puts on it before the job ends. Where the geometry is fiddly, or where the roof runs up against a neighbour's boundary and a naked flame has no business being there, the answer is cold-applied liquid waterproofing instead, laid as the HYDRONYLON system whose assessment we name in the specification rather than leaving you to guess. Plenty of roofs get both: sheet across the open area, liquid at the awkward end.

Comparison

Three jobs, and what actually differs

A rear extension tying into the house

The roof itself is usually the easy part; the junction with the existing house is the job. The covering has to turn up the main wall high enough to survive driving rain, tuck into brickwork that was never built with this roof in mind, and meet whatever the existing rainwater goods are doing. Where bifold or patio doors fix the finished floor level, the build-up has to work back from that height rather than the other way round.

A garage or outbuilding

Simple geometry, and the questions move to the structure. Old outbuildings were built with a different lifespan in mind: sound walls over tired timbers, or a perimeter rebuilt more than once. What the building can carry, and whether its edges are square enough to detail cleanly, decides the specification. Where the finished roof is meant to be walked on rather than merely watertight, it becomes a roof terrace and the surface is designed with the structure. Where the outbuilding already has a covering and the question is whether it can be saved, that is a re-covering rather than a build, and it turns on the boarding rather than the drawings.

A dormer

More detailing per square metre than any other flat roof we build: a small top, two cheeks, a junction with the pitched roof either side, a window head below and often a trim along the front, all within a couple of metres. The field is trivial and the edges are everything, which is why dormers are where cheap work shows first.

On site

Working alongside your builder

Most new roofs land in the middle of somebody else's programme, so three things are agreed in writing before we price anything.

  • Who lays the deck. Usually the builder, boarding to our specification and to the falls we set out; sometimes us, as structural and decking work. Either is fine. What is not fine is each side assuming the other one is setting the slope.
  • When we come. After the structure and the boarding, before anything is loaded onto the roof and before the internal finishes go in. Roofs that go on too early get walked over by every following trade; roofs that go on too late hold up the plasterer.
  • What is decided. The build-up and the insulation depth, because they set finished heights; where the water leaves the roof; the covering; and who supplies what. A roof cannot be priced honestly while any of those is still open.

If new fascias, soffits or gutters are part of the same job, they are roofline work and belong in the same quotation rather than as a surprise at the end.

Regulations

Building control, in plain terms

A new flat roof is usually building work, so it falls under the Building Regulations, and that includes requirements about insulation as well as the construction around it. Some small detached outbuildings sit outside them altogether, and whether yours does is your building control body's call rather than ours. What applies to your project otherwise depends on the project: what it is attached to, what it is for, and what your building control body wants to see. We build to the approved details for the job and provide what the inspector needs on the roof build-up.

What you will not find here is a regulation number or a target figure: those belong in your project's approved documents, not on a page that cannot see your drawings.

Money

What moves the price

Six things, in roughly the order they matter.

  • Size and shape: corners and changes of direction cost more than area.
  • Access: what can be carried in, and what needs scaffold.
  • The deck, and whether it is ours to lay or arrives finished.
  • Insulation depth, which follows the design rather than the budget.
  • The count of abutments, upstands and penetrations, which is the real measure of a roof's difficulty.
  • Roofline work, if the job includes it.

No rate goes on this page for the same reason no timescale does. The figure is written for your drawings, and it is written before anything is ordered.

Working the other way round, with a tired roof already up there? That is flat roof replacement, and if the question is how much life it has left, a condition survey answers that first.

A roof built new carries no unknown history at all, which makes it worth keeping that way: an inspection on a repeat cycle can be arranged from the day it is handed over, charged per roof and from year one. The boundary between what that covers and what is quoted apart from it is written out under aftercare.

Questions

Frequently asked questions

Do you take on work for builders as well as homeowners?

Both, and the arrangement differs. With a builder we usually supply and fix the roof against their drawings and their programme, working on the deck they leave us once the specification is agreed and once it has been checked against that specification, because whoever laid a deck is responsible for it and covering one we have doubts about helps nobody. With a homeowner we take the roof end to end and deal with the builder directly, so nobody in the middle is relaying decisions they cannot judge.

How long does a new flat roof take?

No number belongs on a web page: the size, the access, the weather windows and the builder's own sequence all move it, and a roof that waits three weeks for a structural opening is not a slow roof. What you get instead is the programme in writing, and a fresh one whenever the site moves it.

Warm roof or cold roof on a new extension?

Warm is the modern default: the insulation sits above the deck, the structure stays at room temperature and condensation is designed out rather than ventilated away. Cold build-ups are the exception on new work rather than an equal option, because a flat void is hard to ventilate reliably, and one is specified only where height is genuinely trapped by a threshold or a planning line. The design settles which applies before anything is ordered.

Who lays the deck, you or the builder?

Either, but it is agreed in writing before the roof is priced. Most often the builder frames and boards it to our specification and we take it from there; where it suits the programme better, we do the boarding ourselves. What never works is both parties assuming the other set the falls.

Can you put a new roof on an old garage?

Usually, once we have looked at what is carrying it. Old outbuildings often have sound walls and a tired structure, or the reverse, and the perimeter matters as much as the span. If the building cannot take a modern build-up without work first, we say so before quoting rather than after starting.

Got drawings, or just an idea?

Send what you have, even if it is a sketch and a postcode. We will tell you what the roof needs and what it will cost to build properly.

Give us a phone number or an email address, whichever suits you.

A picture of the stain inside, or of the roof if there is a safe window to take one from, usually saves a question. They go up when you press send, which is the slowest part on a phone signal, and the form will tell you how far it has got.

Or call 07593 196505

Coming out and pricing the work is free; a written condition survey carries a fee, agreed before the visit and taken off the price of the work if you go ahead.