Single ply

Single Ply Roof Repair & Liquid Overlay

Plenty of London roofs built in the last thirty years are single ply, and plenty of them are now at the age where the seams and details need attention. We repair those roofs and, where the evidence supports it, renew them with a liquid overlay rather than a strip-off. What we do not do is lay new single ply, and this page is straightforward about the line between the two.

Book a survey

Or call us on 07593 196505

The short answer: Existing single ply roofs are repaired where they nearly always fail, at the welded seams and details rather than in the sheet. Where an adhesion test carried out on your own roof comes back positive, a liquid overlay can renew it without a strip.

Scope

What we do and do not do with single ply

Our own trade is reinforced bituminous membrane, torch-on felt, and liquid systems applied cold. We are trained to survey flat roofs of every kind and we advise across all of them, which is a different thing from laying all of them. So: existing single ply roofs we inspect, repair and overlay. New single ply roofs we do not install, and no page here will suggest otherwise. If your roof needs one, our report says so and you take it to a contractor approved by the relevant manufacturer.

The comparison itself, how these membranes stack up against the built up systems we do lay, is worked through in our guide to RBM versus single ply, written from the same position: we survey both families and install one of them.

Repair covers the thermoplastic membranes, PVC and TPO, and EPDM rubber alongside them. Overlay is narrower, and the distinction is worth stating rather than blurring: the liquid system we install names PVC among the substrates it is assessed on, and does not name TPO or EPDM. Those two are surveyed, repaired and advised on, and whether a particular roof will take an overlay is settled on the roof by inspection and an adhesion test, never promised from a page.

How it fails

How single ply roofs fail

These are thin, factory-made sheets doing a job that depends almost entirely on how they were joined and held down.

  • Seams. The sheet itself usually outlives the welds between sheets. A weld that was cold, contaminated or rushed on installation day can hold for years and then open, and a seam that has begun to peel will keep peeling.
  • Mechanical damage. A thin membrane is easily punctured by a dropped tool, a dragged ladder, a fixing left on the deck or an aerial installer in trainers. Damage of this kind is the most repairable of all, provided somebody finds it.
  • Shrinkage at upstands. Some membranes tighten slightly over their life, and a sheet pulling in drags at its perimeter. The evidence is at the edges: bridging where the covering no longer sits into the angle, strain at corners, and eventually a split at the top of an upstand.
  • Fixings and wind. Mechanically fastened roofs rely on fasteners through the membrane and into the deck. Fixings that have backed out, corroded or been placed into a deck that has since softened let the sheet lift and flutter, which fatigues the seams from underneath.
  • Details and penetrations. Prefabricated corners, pipe collars and outlet flanges are the fiddly parts of the system and they age faster than the open field.

The decision

Repair first, where repair is real

A punctured membrane with sound seams and a dry build-up beneath is a repair, not a project. Isolated damage is made good compatibly with the membrane on the roof, and the useful question afterwards is what caused it: a roof punctured by whoever services the plant will be punctured again next year unless something changes about access.

Where repair stops being honest is when the same roof keeps producing new failures in different places. Seams opening in several bays, widespread strain at upstands, or a membrane that has gone brittle underfoot are signs of a covering nearing the end of its service rather than an unlucky roof, and continuing to patch it is simply buying the same winter twice. Once a roof reaches that stage, the choice between refurbishing and renewing deserves a proper answer.

Suitability

When a liquid overlay genuinely works

Overlaying an existing PVC roof with a cold-applied liquid waterproofing system, HYDRONYLON in our case, is attractive for the obvious reasons: the old membrane stays where it is, nothing is stripped, the deck is never exposed and the building underneath carries on working. Applied wet, the new layer runs over seams, around fixings and into details as one continuous surface, which suits a roof whose weakness is precisely its joints.

It works when the conditions are met, and PVC is the membrane the system's assessment names, which is where the shortlist starts. Anything else is judged the way substrates outside the assessment always are, on the roof rather than on a page. How the rubber sheet compares with the systems we do install is set out in EPDM, felt or liquid. The existing membrane has to be firmly held down, sound rather than brittle, cleanable to a state something will bond to, and dry all the way through the build-up beneath. Adhesion is proved on the roof itself, on the actual membrane, before the specification is finalised: the material is named, made ready to the system's own instructions and then tested, because two roofs that look identical from the ground can behave differently under preparation.

Limits

And when it does not

There are single ply roofs no overlay should go near, and saying so costs us work occasionally. Membranes that release plasticiser towards the surface may refuse to hold anything applied over them, or appear to hold and then let go later, which is worse. Some surfaces cannot be cleaned up to a state anything will stick to, however long is spent on them. A loose-laid or ballasted roof that was never fastened down does not become a candidate because somebody has swept the ballast off. And a membrane already shrinking hard at its perimeter is telling you it is under tension, which does not stop when something is laid on top of it.

Above all, insulation that has gone wet under the membrane changes the question entirely: the sheet is no longer what is wrong, and an overlay would shut the moisture in. The answer then is taking the roof off and rebuilding it, and we will price that instead. Which of these applies to your roof is settled on the roof itself, by identification, preparation and an adhesion test. Where the answer also needs moisture readings taken through the build-up, that is what a condition survey adds, and whatever guarantee attaches to the specified route is put down in writing beside the price.

Questions

Frequently asked questions

Do you install new single ply roofs?

No. The systems we lay are reinforced bituminous membrane, torch-on felt, and liquid waterproofing applied cold, and those are what we are trained and equipped for. Single ply is a different discipline with its own welding equipment, its own manufacturer approvals and its own detailing, and claiming competence we have not built would be dishonest. We survey single ply, advise on it, repair it and overlay it, and where a new single ply roof is genuinely the right answer we will say that too.

How do I tell PVC from TPO on my own roof?

Often you cannot from ground level, and it matters more than people expect. PVC is typically softer and more flexible to the touch and its seams look chemically fused; TPO tends to be stiffer with heat-welded seams. Which one you have decides what can be laid over it: the liquid system we install names PVC among its substrates and does not name TPO. So the material is identified properly during the survey rather than assumed.

Can any single ply roof take a liquid overlay?

No, and that is the honest headline. Suitability depends on the membrane type, its age and condition, how firmly it is held down and how it behaves under preparation and adhesion testing on the day. Some membranes take an overlay readily, some need specific preparation, and some should simply be replaced rather than built on.

What is plasticiser migration and why does it matter?

Some flexible membranes contain plasticisers that keep them supple, and over the years those can move towards the surface. Anything applied on top may then struggle to hold, or may hold at first and let go later. It is one of the reasons adhesion is tested on the actual roof instead of being taken on trust from the material name.

What about TPO and EPDM roofs?

We survey both, repair both and advise on both. Neither is a substrate the liquid system we install names in its assessment, so neither gets an overlay promised to it from a web page. Whether one suits a particular roof is settled on the roof itself, by inspection and an adhesion test on the actual membrane, and where a surface sits outside what the assessment names, the guarantee position for it is written into the quote before anybody starts.

Single ply roof past its best?

Tell us roughly when it went on, what the seams look like now and whether anything is standing on it, and we will pick it up from there.

Give us a phone number or an email address, whichever suits you.

A picture of the stain inside, or of the roof if there is a safe window to take one from, usually saves a question. They go up when you press send, which is the slowest part on a phone signal, and the form will tell you how far it has got.

Or call 07593 196505

Coming out and pricing the work is free; a written condition survey carries a fee, agreed before the visit and taken off the price of the work if you go ahead.